Skip to content

Vessel stowage

Draft & Trim Calculator (TPC, MTC, LCF)

Work out the new forward and aft drafts after loading, discharging or shifting weights, from your ship’s TPC, MTC and LCF.

Ship & hydrostatic data

Results update as you type.
m
m

Distance of the centre of flotation from the aft perpendicular.

t/cm
t·m/cm
m
m

Load, discharge, shift

t
m

New drafts (forward / aft)

5.308 / 5.508 m

Trim 0.2 m by the stern

Sinkage+10 cm
Change of trim40 cm by the head
Mean draft5.408 m
Load here → aft draft unchanged64.67 mAP
For education/estimation

Trim sketch

LCFAft 5.508Fwd 5.308

Small-change theory (constant TPC/MCTC/LCF). Positions from the aft perpendicular forward; trim + = by the stern.

Calculation steps

Initial trim
0.6 m by the stern
Net weight change
+150 t
Sinkage
+10 cm
Trimming moment about LCF
+4,800 t·m
Change of trim
−40 cm
Aft draft change
−9.2 cm
Forward draft change
+30.8 cm
Load here → aft draft unchanged
64.67 m
Load here → forward draft unchanged
32.62 m

About this calculator

Every tonne loaded makes the ship sink a little (sinkage) and, unless it is placed right above the centre of flotation (LCF), also changes the trim. Officers and planners work this out again and again: is the aft draft still within the channel limit, will the ship trim by the head once the forward hold is full, or where must the remaining cargo go to finish on even keel?

This calculator uses three figures from the hydrostatic table at the ship's mean draft: TPC (tonnes per centimetre immersion), MTC (moment to change trim 1 cm, t·m/cm) and LCF (longitudinal centre of flotation measured from the aft perpendicular). Sinkage = Σ weight ÷ TPC. Trimming moment = Σ weight × (position − LCF); cargo forward of the LCF trims the ship by the head, and change of trim = moment ÷ MTC. The change of trim is shared between the ends in proportion to their distance from the LCF: the aft draft changes by trim × LCF ÷ LBP, the forward draft by the rest.

You can enter several load, discharge and shift lines at once. The calculator also shows the position where extra cargo does not change the aft draft (or the forward draft) — the classic trick when the ship is already at its aft draft limit. The formulas are accurate for small changes (usually below ±25 cm of sinkage); for large changes, repeat with TPC/MTC/LCF at the new draft.

Worked example

Ship LBP 100 m, forward draft 5.00 m, aft 5.60 m, TPC 15 t/cm, MTC 120 t·m/cm, LCF 48 m from AP. Load 150 t at 80 m from AP:

  • Sinkage = 150 ÷ 15 = 10 cm
  • Moment = 150 × (80 − 48) = 4,800 t·m forward → change of trim 4,800 ÷ 120 = 40 cm by the head
  • Aft: 10 − 40 × 48/100 = −9.2 cm → 5.508 m; forward: 10 + 40 × 52/100 = +30.8 cm → 5.308 m
  • Final trim 0.20 m by the stern; position that keeps the aft draft unchanged: 48 + 120 × 100 ÷ (15 × 48) = 64.67 m from AP

How to use it

  1. Enter ship data

    Enter LBP, the current forward and aft drafts, then TPC, MTC and LCF from the hydrostatic table at the mean draft.

  2. Add weight lines

    For each load/discharge enter weight and LCG (metres from the aft perpendicular); for a shift enter the from and to positions.

  3. Read the new drafts

    See sinkage, change of trim, new forward/aft drafts and the trim sketch, updated as you type.

  4. Find the neutral position

    Use the "aft draft unchanged" position to place extra cargo without increasing the aft draft.

Frequently asked questions

Why the LCF and not midship?
A ship trims about the centre of its waterplane (LCF), not about midship. On ships with a wide stern the LCF is often several metres aft of midship, so using midship gives wrong end drafts.
Where do I get TPC, MTC and LCF?
From the hydrostatic table in the ship's stability booklet, at the mean draft (more precisely the draft at the LCF) and the right water density. For brackish water, correct TPC by the density ratio.
What are the sign conventions?
Positions are measured from the aft perpendicular (AP) forward. Positive trim means trim by the stern (aft draft larger). Cargo forward of the LCF gives a negative change of trim (by the head).
When are these formulas no longer accurate?
When the weight change is large enough for TPC, MTC and LCF to change, or the trim is large (more than about 1% of LBP). The ship's loading computer solves equilibrium with the full hydrostatic curves.

Related guides

3D Cargo Planner

Stow cartons, pallets and odd-shaped cargo in a container or truck, then download the loading steps.

Vessel Planner

Plan the whole vessel →

Bay plans, barge deck layouts, stability and longitudinal strength from your ship's hydrostatic data, DG and VGM in one planner shared with your team.