Skip to content
Ports & services

Dwelling Time

In Indonesian: Dwelling Time (waktu inap kontainer)

Dwelling time is how long an import container stays in the terminal, from discharge off the vessel until it leaves the port gate. In Indonesia it is commonly split into pre-clearance, customs clearance and post-clearance stages and is used as a port performance indicator. Long dwelling time raises storage, demurrage and inventory costs. Having documents complete before the vessel arrives and collecting promptly once customs release (SPPB) is issued keep it short.

  • Release Approval (SPPB)

    The SPPB is the customs approval to release imported goods from the customs area once the PIB is processed, levies are paid and the checks for the assigned channel are done.

  • Customs Channel (Red, Yellow, Green)

    The customs channel is the risk-based routing of an import or export declaration that decides how much checking it gets.

  • Container Yard (CY)

    A container yard is the stacking area in a terminal where full and empty containers are stored before loading or after discharge.

  • Demurrage

    In container shipping, demurrage is the charge a shipping line levies when its container stays in the terminal beyond the free time, such as an import box not yet collected.

Covered in these guides

← Back to glossary

Try it in the 3D Planner

Enter your cargo dimensions and weights, pick a container or truck, and see the load layout, utilisation and centre of gravity in 3D. Free, no sign-up.

Load planning simulation. Not a substitute for official weighing, VGM, the vessel loading computer, or operator approval.